Covering every engineering system across more than 4,000 square meters
Due to the stringent requirements of the HDD industry, our engineering team spent 7 months transforming over 4,000 square meters into ISO 5 and ISO 6 cleanrooms We were responsible for everything from design to complete system installation. The Scope of Work included:
Air Conditioning and Ventilation System: HVAC, M&E, Ducting, and Smart Control systems
Advanced Air Filtration System: FFU (Fan Filter Unit) equipped with ULPA filters and control software
Internal Structure and Architecture: Installation of PIR cold room walls, automatic door systems (Auto Door), and Aluminum (AL) Raised Floors with Anti-static Conductive Floor Tiles
Production Support Systems: DI Water purification system, Utility Hook Up services, and Fire Fighting systems